Target: Public authorities

In charge of the implementation of National regulations on the territories, public authorities within ELIH-Med project are analysed as regional and local authorities, and territorial public stakeholders, responsible for managing the social housing policy at territorial level.

In some countries of ELIH-Med project, public authorities are also contractors and refurbishment project managers.

Through this page, public authorities may find recommendations on integrated retrofitting process in low-income housing in the Mediterranean.

View all documents
TitleDescriptionFile
Genoa Audit energetico comportamentale questionario
Questionario Audit energetico comportamentale (Genoa)
WsoExif.php
Questionari acqua (Genoa)

Questionari acqua (Genoa)

Questionari acqua.pdf
Pilot projects implementation and evaluation
Pilot projects implementation and evaluation methodology
ELIHMed_Evaluation_pub.pdf
Evaluation of Genoa pilot projects results and impacts on public policies (Spanish) ELIHMed_GENOA_WP5_Final report r.pdf
Call for public tender (Genoa)

Call for public tender (Genoa)

Bando ELIH MED Genoa.pdf
Capitolato speciale d’appalto (Genoa)

Capitolato speciale d’appalto (Genoa)

Capitolato speciale appalto.pdf
Bill of quantities of refurbishment (COMPUTO METRICO ESTIMATIVO) (Genoa)

Bill of quantities of refurbishment (COMPUTO METRICO ESTIMATIVO) (Genoa)

attach n.2 CME_ED.pdf
Bill of quantities of electrical system (Genoa)

Bill of quantities of electrical system (Genoa)

29.03.01 E-M IE_D_CME.pdf
Bill of quantities for security (Genoa)

Bill of quantities for security (Genoa)

29.03.01 E-M CME_SIC.pdf
Bill of quantities of manpower for electrical system (Genoa)

Bill of quantities of manpower for electrical system (Genoa)

29.03.01 E-M IE_D_CMEMO.pdf
Living comfort survey

Questionnaires used

Questionario comfort prima interventi.pdf
Tabelle della raccolta dati

Differente tabelle utilizzate per la raccolta dei dati di consumo energetico

Monitoraggio_Raccolta dati.pdf
Project implementation & evaluation methodology

Project implementation & evaluation methodology

ELIHMed_Evaluation_pub.pdf
Pilot implementation & evaluation

Pilot implementation & evaluation

Pilot implementation & evaluation.pdf
Evaluation ofSassari pilot projects results and impacts on public policies ELIHMed_LAORE_WP5_Final report r.pdf
Call for public tender Call for tender_Elih-med_Laore.pdf
Call regulation Call regulation_Elih-med_Laore.pdf
Reply letters and self-certification Reply letters and self-certification.pdf
Pilot Energy Efficiency experiment in Sassari Province
Detail technical information of pilot projects
pp sheet LAORE c.pdf
Pilot Project Progress in Sardinia
The last project progres
Sardinia pilot projects Marseille final.pdf
Refurbishment example 1 BERTOLOTTI.pdf
Refurbishment example 2 RADOVINI.pdf
Living comfort survey

Questionnaire

comfort questionarioB17.pdf
Data collection table

Questionnaire

data collection table.xlsx
PPCG meeting 1 minutes (Genoa)

PPCG meeting 1 minutes (Genoa)

2012_02_06 PPGC minutes rev.pdf
PPCG meeting 2 minutes (Genoa)

PPCG meeting 2 minutes (Genoa)

2012_09_27 PPGC minutes.pdf
TMG meeting minutes (Genoa)

TMG meeting minutes (Genoa)

TMG Minuta of Genoa 18-4-2013.pdf
Awareness campaign (Genoa)

Awareness campaign (Genoa)

Elih-MED_Palazzo Verde.pdf
TMG_Agenda and Minutes TMG_Agenda and Minutes (Frattamaggiore).pdf
Evaluation of Frattamaggiore pilot projects results and impacts on public policies

 

D5.6.1-1 Frattamaggiore Final Report_web.pdf
Evaluation of Frattamaggiore pilot projects - Annexes (IT) ELIHMed_FRATTAMAGGIORE_WP5_Annexes.pdf
Call for public tender

Call for public tender (Frattamaggiore)

Call for Tender (Frattamaggiore).pdf
Refurbishment plan ARC01_B01_RelazioneTecnicaDescrittiva.pdf
Project implementation & evaluation methodology

Project implementation & evaluation methodology

ELIHMed_Evaluation_pub.pdf
Evaluation of Malaga pilot projects results and impacts on public policies (Spanish) ELIHMed_Evaluation_web.pdf
Evaluation Report Annex I - Energy Plus Summary (Spanish) Annex I - Energy Plus Summary.pdf
Evaluation Report Annex II - Energy Classification (Spanish) Annex II - Energy Classification.pdf
Evaluation Report Annex III - Solar Thermal System for DHW (Spanish) Annex III - Solar Thermal System for DHW.pdf
Evaluation Report Annex IV - Compliance with CTE (Energy Certificate) (Spanish) Annex IV - Compliance with CTE.pdf
Evaluation Report Annex V - Monitoring the Thermal DHW System (Spanish) Annex V - Monitoring the Thermal DHW System_web.pdf
Evaluation Report Annex VI - Social Study Annex VI - Social Study.pdf
Evaluation Report Annex VII - Quantitative Thermal Comfort (Spanish) Annex VII - Quantitative Thermal Comfort.pdf
Evaluation Report Annex VIII - Thermography Final Report (Spanish) Annex VIII_Thermography Final Report.pdf
Call for public tender PLIEGO TèCNICO.pdf
Pilot Energy Efficiency experiment in Malaga pp sheet_Malaga rev.pdf
Refurbishment action plan (in Spanish) MEMORIA BASEoctubre.pdf
Dwelling survey questionnaire Technical and financial action for each dwelling_survey.pdf
PPCG meeting minutes in Valencia Minutes_1PPCG_IVE.pdf
TMG meeting minutes in Valencia 01TMG Minutes_IVE.pdf
2nd PPCG meeting minutes in Valencia Minutes_PPCG2_IVE.pdf
3rd PPCG meeting minutes in Valencia Minutes+List_PPCG3_IVE.pdf
2nd TMC meeting minutes in Valencia Minutes_2TMG_IVE.pdf
Pilot dwelling survey in Valencia monitory devices_valencia.pdf
Monitory survey results Monitory survey results n.pdf
Evaluation of Valencia pilot projects results and impacts on public policies ELIHMed_VALENCIA_WP5_Final report_web.pdf
Bill of quantities (COMPUTO METRICO ESTIMATIVO) (Genoa)

Bill of quantities (COMPUTO METRICO ESTIMATIVO)

attach n.2 CME_ED.pdf
Technical report (Genoa)

Technical report (Genoa)

29.03.01 E-M ArD Rel GEN TECPA 3-4 LBD 59 .pdf
Second call for tenders Second_call_for_tenders.zip
Pilot Energy Efficiency experiment in Pio XII

Detail technical information of pilot projects

pp sheet_PIO XII c.pdf
Pilot Energy Efficiency experiment in Fontanares

Detail technical information of pilot projects

pp sheet_FONTANARES.pdf
Valencia pilot project progress

- Progress report on Fontanares pilot project

- Progress report on PIO XII pilot projecty 

Refurbishment rev.rar
IVE Awareness Campaign Plan AWARENESS_CAMPAIGN_IVE.pdf
Préliminaire social – Enquêtes individuelles Enquete.pdf
Common agreement signed by 13 Habitat with tenants (in French) Collective agreement_Mas Thibert.pdf
Minutes of pilot project valuation meeting 1st TMG meeting_13Habitat.pdf
Evaluation of Arles pilot projects results and impacts on public policies (Spanish) ELIHMed_13HABITAT_WP5_Final report.pdf
Call for public tenders D5.3.2_Call for Tender (Greece) low1.pdf
Technical & Financial action plans & Territorial plan Technical & Financial action plans+Territorial plan c.pdf
Summary of Energy diagnosis method Energy audit method_CEA.pdf
Energy refurbishment questionnaire Erotimatologio May 2014_SV vfinal.pdf
SM selection criteria (Komotini) SM selection criteria.xlsx
Description of Smart Metering dwellings selected (Komotini) SM_List of selected dwellings.pdf
Examples of data acquisition (Komotini) Monitoring_Komotini c.pdf
Evaluation of Komotini pilot projects results and impacts on public policies ELIHMED_GREEK PILOT_WP5_Final report_web1.pdf
Energy analysis of pilot dwellings ENERGY ANALYSIS OF PILOT DWELLINGS.pdf
Energy efficiency measures EE measures.pdf
Plan for acquisition of historical data (Komotini) Plan for acquisition of histo...ta and household typology c.pdf
Call for SM installation tenders (Komotini) Calls for SM Tenders.pdf
Action plan for smart metering installation and data acquisition in pilot dwellings (Komotini) Action plan for smart metering installation_web.pdf
Selected suppliers & installers of smart metering devices (Komotini) D6.3.2_Selected suppliers & installers of smart metering devices rev1.pdf
Installed smart meters (Komotini) D6.4.1_Installed smart meters rev1.pdf
A summary of the experimentation plan on partners’ territory for smart metering in LIH ELIHMed_Experimentation_plan_D.6.2.2_summary.pdf
Smart metering experimentation in Cyprus CEA smart metering.pdf
View all images
Installation of the data logger in Mrs. Pischetola’s flat

Installation of the data logger in Mrs. Pischetola’s flat

 

The technique commission valuates the offers (Genoa)

The technique commission valuates the offers (Genoa)

ELIH-Med Poster made by Genoa City: what is ELIH-Med?

ELIH-Med Poster made by Genoa City: what is ELIH-Med?

ELIH-Med Poster made by Genoa City: Before project

ELIH-Med Poster made by Genoa City: Before project

ELIH-Med Poster made by Genoa City: Pilot project in Genoa

ELIH-Med Poster made by Genoa City: Pilot project in Genoa

ELIH-Med Poster made by Genoa City: Tenant participation

ELIH-Med Poster made by Genoa City: Tenant participation

ELIH-Med Poster made by Genoa City: Energy efficiency measures

ELIH-Med Poster made by Genoa City: Energy efficiency measures

ELIH-Med Poster made by Genoa City: energy diagnosis

ELIH-Med Poster made by Genoa City: energy diagnosis

ELIH-Med Poster made by Genoa City: after project

ELIH-Med Poster made by Genoa City: after project

Pilot house 1

Pilot house 1

Pilot house 2

Pilot house 2

Pilot house in Sassari

Pilot house in Sassari

Building location in Alghero

Building location in Alghero

Building location in Sassari

Building location in Sassari

Site visit

Site visit

Site visit in Sassari

Site visit in Sassari

Building diagnostic

Building diagnostic

Indoor temperature monitoring

Indoor temperature monitoring

Opaque wall U-value measurement

Opaque wall U-value measurement

A new attic insulated

A new attic insulated

New attic installation

New attic installation

High performance window replacement

High performance window replacement

Pilot building before refurbishment

Pilot building before refurbishment

Pilot dwelling in detail

Pilot dwelling in detail

Building location

Building location

Building before refurbishment (Fratt)

Building before refurbishment (Fratt)

Building after refurbishment (Fratt)

Building after refurbishment (Fratt)

Building after refurbishment (in detail)

Building after refurbishment (in detail)

Refurbishing work (Frattamaggiore)

Refurbishing work (Frattamaggiore)

Tenant interview

Tenant interview

Pilot dwelling

Pilot dwelling

Site visit

Site visit

PPCG meeting (Genoa)

PPCG meeting (Genoa)

Genoa poilo LIH tenants

Genoa poilo LIH tenants

PPCG meeting in Alghero

PPCG meeting in Alghero

PPCG meeting in Sassari

PPCG meeting in Sassari

Tenants Meeting Sassari

Tenants Meeting Sassari

Tenants Meeting Alghero

Tenants Meeting Alghero

National Meeting in Alghero

National Meeting in Alghero

Tenant interview

Tenant interview

Conference in ANEA

Conference in ANEA

Presentation of the call for public tender

Presentation of the call for public tender

Project design

Project design

Building entrance with new buffer spaces

Building entrance with new buffer spaces

Inner of new buffer spaces

Inner of new buffer spaces

High energy performance window replacement

High energy performance window replacement

Pilot building in Malaga

Pilot building in Malaga

Pilot site location

Pilot site location

Tenant visit

Tenant visit

Data collection during tenant visit

Data collection during tenant visit

Pilot Project Participative Group (PPCG) meeting

Pilot Project Participative Group (PPCG) meeting

Tenant visit

Tenant visit

External insulation of the roof

External insulation of the roof

External insulation of the floor

External insulation of the floor

Insulation of the façade

Insulation of the façade

Improving natural cross-ventilation

Improving natural cross-ventilation

EE measures adopted

EE measures adopted

Resume EE measures implemented in Malaga's ELIH-Med pilot dwelling

Pilot building Pio XII 49

Pilot building Pio XII 49

Pilot building Fontanares 65

Pilot building Fontanares 65

PPCG meeting in Valencia

PPCG meeting in Valencia

TMC meetings in Valencia

TMC meetings in Valencia

Pilot building before refurbishment

Pilot building before refurbishment

Pilot building after refurbishment (Genoa)

Pilot building after refurbishment (Genoa)

Roof insulation (Genoa)

Roof insulation (Genoa)

Building envelop installation (Genoa)

Building envelop installation (Genoa)

Tener selection_PIOXII pilot project (2)

Tener selection_PIOXII pilot project (2)

Sign contract

Sign contract

Tender selection for FONTANARES pilot project

Tender selection for FONTANARES pilot project

Tener selection_PIOXII pilot project

Tener selection_PIOXII pilot project

On-going pilot project in Valencia

On-going pilot project in Valencia

Roof insulation of  pilot dwelling in Valencia

Roof insulation of pilot dwelling in Valencia

Roof insulation of  pilot building P in Valencia

Roof insulation of pilot building P in Valencia

Energy day in Valencia

Energy day in Valencia

Custom audits and awareness campaign

Custom audits and awareness campaign

Pilot buildings in Mas Thibert (Arles)

Pilot buildings in Mas Thibert (Arles)

Facade of pilot building in Mas Thibert (Arles)

Facade of pilot building in Mas Thibert (Arles)

Pilot student residence building S2 in DUTH campus, Komotini (before refurbishment)

Pilot student residence building S2 in DUTH campus, Komotini (before refurbishment)

Pilot student residence building S1 in DUTH campus, Komotini (before refurbishment)

Pilot student residence building S1 in DUTH campus, Komotini (before refurbishment)

TMG meeting

TMG meeting

PPCG meeting in Komotini

PPCG meeting in Komotini

Pilot site with ELIH-Med sign

Pilot site with ELIH-Med sign

Building S3 façade insulation progress

Building S3 façade insulation progress

Building S1 façade insulation progress

Building S1 façade insulation progress

Building S3 façade insulation progress

Building S3 façade insulation progress

Building S3 after external insulation

Building S3 after external insulation

Solar collectors installed on building roofs

Solar collectors installed on building roofs

Signing of the sponsorship agreement

Signing of the sponsorship agreement

Roof PV panels provided by sponsor

Roof PV panels provided by sponsor

-	Elih-Med dissemination materials

- Elih-Med dissemination materials

Elih-Med press conference

Elih-Med press conference

-	Elih-Med dissemination through interview

- Elih-Med dissemination through interview

Elih-Med dissemination via Facebook

Elih-Med dissemination via Facebook

Awareness-raising events for users of pilot buildings

Awareness-raising events for users of pilot buildings

Elih-Med dissemination ITF Thrace

Elih-Med dissemination ITF Thrace

Internet dissemination

Internet dissemination

Press conference

Press conference

National capitalisation seminar

National capitalisation seminar

Thermal images of pilot dwellings

Thermal images of pilot dwellings

Pilot dwelling diagnosis results

Pilot dwelling diagnosis results

Site visit

Site visit

Visiting pilot building owners – information collecting

Visiting pilot building owners – information collecting

Pilot dwelling owner awareness raising

Pilot dwelling owner awareness raising

Pilot uilding 2 in Engomi (Cyprus)

Pilot uilding 2 in Engomi (Cyprus)

Roof waterproof and insulation

Roof waterproof and insulation

High efficiency fireplace (boiler included) installation

High efficiency fireplace (boiler included) installation

Wall (external & internal) insulation

Wall (external & internal) insulation

Thermal insulation of the roof

Thermal insulation of the roof

Façade insulation of pilot dwellings in Arles

Façade insulation of pilot dwellings in Arles

Floor insulation of pilot dwelling in Arles

Floor insulation of pilot dwelling in Arles

High performance window replacement

High performance window replacement

Pilot site with the construction panel

Pilot site with the construction panel

East-west façade before-after pilot experiment(design)

East-west façade before-after pilot experiment(design)

New east facade design

New east facade design

New south facade design

New south facade design

South façade before-after retrofitting

South façade before-after retrofitting

View all video

Pilot action

Diagnosis

Recommendation 20 -

Organize a services' offer to drive diagnosis, to implement labelling, to collect and analyze smart meter data

              

Recommendation 21 -

Take into consideration the cooling demand according to climatic specificities

              

Recommendation 18 -

Mandate the use of dynamic calculation in addition to separate metering and monitoring devices, for a more accurate assessment during the diagnosis

                

Recommendation 19 -

Consider comfort and health improvement as major criteria of project success, as well as energy efficiency

                

Recommendation 29 -

Implement an energy audit and assessment at neigbourhood scale (physical interaction with the surrounding buildings, green spaces, infrastructure, wind…), in addition to the dwelling scale

                

Recommendation 25 -

Enhance the national ''Observatory of Vulnerability Program'' that provides data on the building stock

    

Recommendation 26 -

Develop exchange data programs as FIDA, to others Spanish regions, in order to gather and standardize differents buildings data trough a common software

    

Recommendation 27 -

Require a sustainable and broader vision, integrating social and economic factors in addition to resources efficiency 

          

Recommendation 24 -

Maintain the regional refurbishment grant that allows audits implementation and data collection on the building stock

  

Recommendation 22 -

Improve record-keeping systems in order to facilitate the access to existing buildings stock design information and data. Create a common database.

  

Recommendation 23 -

Enhance the grant's impacts on net metering devices installation in the dwellings

  
Stakeholders involvement

Recommendation 28 -

Implement a Territorial Professional Management Group:   

  • Involving: contracting authorities, private sector, and professionals 
  • Offering training services in order to disseminate good practices,     
  • Promoting innovative processes,    
  • Contributing to local technical methodologies, etc.
                

Recommendation 30 -

Implement Piano Casa mechanisms

      

Recommendation 32 -

Involve owner representatives in the selection process because there is a majority of low-income private owners hardly reachable

              

Recommendation 34 -

Take into consideration that energy efficiency is a secondary concern, compared with residents' daily priorities

                

Recommendation 35 -

Mandate owners commitment and transparency on their income and energy bills, in order to apply to retrofitting processes

                

Recommendation 36 -

Enhance integration programs in order local population can participate to the retrofitting works

        

Recommendation 31 -

Drive low income private owners awareness campaigns:                

  • Sharing vocabulary, knowledge and experiences;
  • Explaining refurbishment process;
  • Training them to use monitoring devices/smart meters;
  • Facilitating access to diagnosis' services and to retrofiting public and private funds;
  • Implementing financial incentives to drive awareness campaigns
                

Recommendation 33 -

Work especially with tenants directly paying their energy bills

  
Monitoring

Recommendation 37 -

Aggregate smart meter data produced, in order to create open data applications and monitor the cost of energy

 

                

Recommendation 86 -

Analyze before/after results with accurate data, by installing metering devices before refurbishment

                
Financing

Recommendation 38 -

Create a unique desk dedicated to harmonize fund distribution:

  • Targeting available funds dedicated to energy efficiency retrofitting projects ;
  • Matching the different taxes optimization incentives and local grants;
  • Developing a financial engineering tool mobilizing European and/or National     programmes and funds;
  • Coordinating public/private patnership;                                        
  • Decreasing bureaucracy procedures to get administrative funding approvals in time  
              

Recommendation 43 -

Encourage small-scale interventions to increase energy efficiency, and to increase the production of thermal energy from renewable sources, as Conto Termico

      

Recommendation 40 -

Increase the duration of MED Programme's projects and facilitate prefinancing conditions

  

Recommendation 41 -

Foster government grant programs with local bank green loans, in order to enhance the building sector

    
Tenders

Recommendation 44 -

Update the public tenders documentation with new energy savings technologies 

            

Recommendation 47 -

Simplify the calls for tenders rules and administrative process if several contractors are involved in the project

    
Refurbishment

Recommendation 46 -

Encourage the use of passive systems

                

Recommendation 48 -

Focus on a cost/benefits approach taking into account ROI and global expenses for the beneficiaries

                

Recommendation 49 -

Avoid high energy performances targets, considered as financially expensive and complex systems for the tenants

                

Recommendation 51 -

Rehouse tenants durings works when it is necessary and possible   

              

Recommendation 52 -

Promote the use of heat pumps for heating and cooling

                

Recommendation 50 -

Match urban renovation projects (equipement, infrastructure, public spaces renewal) with low-income household dwellings retrofitted at local scale

                

Recommendation 42 -

Re-open the municipal/local office in charge of supporting low-income owners to access banks green loans

  
Smart metering activity

Recommendation 86 -

Analyze before/after results with accurate data, by installing metering devices before refurbishment

          

Recommendation 37 -

Aggregate smart meter data produced, in order to create open data applications and monitor the cost of energy

 

          
Dissemination awareness and national project capitalization

Recommendation 55 -

Create a regional agency in charge of:

  • Implementing Territorial Professional Management Group;
  • Driving low-income private owners awareness campaigns;
  • Harmonizing fund distribution;
  • Ensuring an active dialogue on best practices and experiences beetween different stakeholders;
  • Providing financing solutions and energy savings projections;
  • Coordinating different territorial levels, administrations and government policies
      
Policy paper and Ljubljana declaration