Target: Refurbishment project managers

Having the responsibility of the planning, execution and closing of the pilot project, refurbishment project managers are the operational organizers of the refurbishment process.Project managers also are contracting stakeholders in charge of public procurement, publication of tenders, etc.Through this page, refurbishment project managers shall find recommendations on concrete solutions to overcome risks and uncertainties in LIH retrofitting in the Mediterranean.

View all documents
TitleDescriptionFile
Genoa Audit energetico comportamentale questionario
Questionario Audit energetico comportamentale (Genoa)
WsoExif.php
Questionari acqua (Genoa)

Questionari acqua (Genoa)

Questionari acqua.pdf
Pilot projects implementation and evaluation
Pilot projects implementation and evaluation methodology
ELIHMed_Evaluation_pub.pdf
Evaluation of Genoa pilot projects results and impacts on public policies (Spanish) ELIHMed_GENOA_WP5_Final report r.pdf
Call for public tender (Genoa)

Call for public tender (Genoa)

Bando ELIH MED Genoa.pdf
Capitolato speciale d’appalto (Genoa)

Capitolato speciale d’appalto (Genoa)

Capitolato speciale appalto.pdf
Bill of quantities of refurbishment (COMPUTO METRICO ESTIMATIVO) (Genoa)

Bill of quantities of refurbishment (COMPUTO METRICO ESTIMATIVO) (Genoa)

attach n.2 CME_ED.pdf
Bill of quantities of electrical system (Genoa)

Bill of quantities of electrical system (Genoa)

29.03.01 E-M IE_D_CME.pdf
Bill of quantities for security (Genoa)

Bill of quantities for security (Genoa)

29.03.01 E-M CME_SIC.pdf
Bill of quantities of manpower for electrical system (Genoa)

Bill of quantities of manpower for electrical system (Genoa)

29.03.01 E-M IE_D_CMEMO.pdf
leaflet (coper) of ELIH-Med awareness campaign COPERTINA HELIMED 26 SETTEMBRE_7.pdf
Agenda of the national ELIH-Med promotion conference Locandina_Elihmed_Alghero_2014.pdf
Living comfort survey

Questionnaires used

Questionario comfort prima interventi.pdf
Tabelle della raccolta dati

Differente tabelle utilizzate per la raccolta dei dati di consumo energetico

Monitoraggio_Raccolta dati.pdf
Project implementation & evaluation methodology

Project implementation & evaluation methodology

ELIHMed_Evaluation_pub.pdf
Pilot implementation & evaluation

Pilot implementation & evaluation

Pilot implementation & evaluation.pdf
Evaluation ofSassari pilot projects results and impacts on public policies ELIHMed_LAORE_WP5_Final report r.pdf
Call for public tender Call for tender_Elih-med_Laore.pdf
Call regulation Call regulation_Elih-med_Laore.pdf
Reply letters and self-certification Reply letters and self-certification.pdf
Pilot Energy Efficiency experiment in Sassari Province
Detail technical information of pilot projects
pp sheet LAORE c.pdf
Pilot Project Progress in Sardinia
The last project progres
Sardinia pilot projects Marseille final.pdf
Refurbishment example 1 BERTOLOTTI.pdf
Refurbishment example 2 RADOVINI.pdf
Living comfort survey

Questionnaire

comfort questionarioB17.pdf
Data collection table

Questionnaire

data collection table.xlsx
PPCG meeting 1 minutes (Genoa)

PPCG meeting 1 minutes (Genoa)

2012_02_06 PPGC minutes rev.pdf
PPCG meeting 2 minutes (Genoa)

PPCG meeting 2 minutes (Genoa)

2012_09_27 PPGC minutes.pdf
TMG meeting minutes (Genoa)

TMG meeting minutes (Genoa)

TMG Minuta of Genoa 18-4-2013.pdf
Awareness campaign (Genoa)

Awareness campaign (Genoa)

Elih-MED_Palazzo Verde.pdf
TMG_Agenda and Minutes TMG_Agenda and Minutes (Frattamaggiore).pdf
Evaluation of Frattamaggiore pilot projects results and impacts on public policies

 

D5.6.1-1 Frattamaggiore Final Report_web.pdf
Evaluation of Frattamaggiore pilot projects - Annexes (IT) ELIHMed_FRATTAMAGGIORE_WP5_Annexes.pdf
Call for public tender

Call for public tender (Frattamaggiore)

Call for Tender (Frattamaggiore).pdf
Refurbishment plan ARC01_B01_RelazioneTecnicaDescrittiva.pdf
ELIH-Med Awareness Raising-Communication Activity Summary ELIH MED WP2 Summary_web.pdf
Project implementation & evaluation methodology

Project implementation & evaluation methodology

ELIHMed_Evaluation_pub.pdf
Evaluation of Malaga pilot projects results and impacts on public policies (Spanish) ELIHMed_Evaluation_web.pdf
Evaluation Report Annex I - Energy Plus Summary (Spanish) Annex I - Energy Plus Summary.pdf
Evaluation Report Annex II - Energy Classification (Spanish) Annex II - Energy Classification.pdf
Evaluation Report Annex III - Solar Thermal System for DHW (Spanish) Annex III - Solar Thermal System for DHW.pdf
Evaluation Report Annex IV - Compliance with CTE (Energy Certificate) (Spanish) Annex IV - Compliance with CTE.pdf
Evaluation Report Annex V - Monitoring the Thermal DHW System (Spanish) Annex V - Monitoring the Thermal DHW System_web.pdf
Evaluation Report Annex VI - Social Study Annex VI - Social Study.pdf
Evaluation Report Annex VII - Quantitative Thermal Comfort (Spanish) Annex VII - Quantitative Thermal Comfort.pdf
Evaluation Report Annex VIII - Thermography Final Report (Spanish) Annex VIII_Thermography Final Report.pdf
Call for public tender PLIEGO TèCNICO.pdf
Pilot Energy Efficiency experiment in Malaga pp sheet_Malaga rev.pdf
Refurbishment action plan (in Spanish) MEMORIA BASEoctubre.pdf
Dwelling survey questionnaire Technical and financial action for each dwelling_survey.pdf
PPCG meeting minutes in Valencia Minutes_1PPCG_IVE.pdf
TMG meeting minutes in Valencia 01TMG Minutes_IVE.pdf
2nd PPCG meeting minutes in Valencia Minutes_PPCG2_IVE.pdf
3rd PPCG meeting minutes in Valencia Minutes+List_PPCG3_IVE.pdf
2nd TMC meeting minutes in Valencia Minutes_2TMG_IVE.pdf
Pilot dwelling survey in Valencia monitory devices_valencia.pdf
Monitory survey results Monitory survey results n.pdf
Evaluation of Valencia pilot projects results and impacts on public policies ELIHMed_VALENCIA_WP5_Final report_web.pdf
Bill of quantities (COMPUTO METRICO ESTIMATIVO) (Genoa)

Bill of quantities (COMPUTO METRICO ESTIMATIVO)

attach n.2 CME_ED.pdf
Technical report (Genoa)

Technical report (Genoa)

29.03.01 E-M ArD Rel GEN TECPA 3-4 LBD 59 .pdf
Second call for tenders Second_call_for_tenders.zip
Pilot Energy Efficiency experiment in Pio XII

Detail technical information of pilot projects

pp sheet_PIO XII c.pdf
Pilot Energy Efficiency experiment in Fontanares

Detail technical information of pilot projects

pp sheet_FONTANARES.pdf
Valencia pilot project progress

- Progress report on Fontanares pilot project

- Progress report on PIO XII pilot projecty 

Refurbishment rev.rar
IVE Awareness Campaign Plan AWARENESS_CAMPAIGN_IVE.pdf
Préliminaire social – Enquêtes individuelles Enquete.pdf
Common agreement signed by 13 Habitat with tenants (in French) Collective agreement_Mas Thibert.pdf
Minutes of pilot project valuation meeting 1st TMG meeting_13Habitat.pdf
Evaluation of Arles pilot projects results and impacts on public policies (Spanish) ELIHMed_13HABITAT_WP5_Final report.pdf
Call for public tenders for façade installation Call for tender_facade.pdf
Call for public tenders D5.3.2_Call for Tender (Greece) low1.pdf
Technical & Financial action plans & Territorial plan Technical & Financial action plans+Territorial plan c.pdf
Summary of Energy diagnosis method Energy audit method_CEA.pdf
Energy refurbishment questionnaire Erotimatologio May 2014_SV vfinal.pdf
SM selection criteria (Komotini) SM selection criteria.xlsx
Description of Smart Metering dwellings selected (Komotini) SM_List of selected dwellings.pdf
Examples of data acquisition (Komotini) Monitoring_Komotini c.pdf
Evaluation of Komotini pilot projects results and impacts on public policies ELIHMED_GREEK PILOT_WP5_Final report_web1.pdf
Letter of conformity with public procurement procedures: tenders Lett conformity_tenders.pdf
Letter of conformity with public procurement procedures: award Letter conformity.pdf
Bid form Bid form.pdf
MODEL CERTIFICATION OF PERSONAL STATEMENT MODEL CERTIFICATION.pdf
CONTRACTOR CERTIFICATES CONTRACTOR CERTIFICATES.pdf
CONDITIONS OF CONTRACT FOR PUBLIC WORKS CONSTRUCTION CONDITIONS OF CONTRACT.pdf
Energy efficiency of low-income households in Cyprus LIH EE in Cyprus.pdf
ELIH-Med project and net metering of low-income houses in Cyprus (in Greek) ELIHMED- NET Metering.pdf
Interview of CEA staff for promoting ELIH-Med Interview of CEA staff for promoting ELIH-Med.pdf
Energy analysis of pilot dwellings ENERGY ANALYSIS OF PILOT DWELLINGS.pdf
Energy efficiency measures EE measures.pdf
Plan for acquisition of historical data (Komotini) Plan for acquisition of histo...ta and household typology c.pdf
Call for SM installation tenders (Komotini) Calls for SM Tenders.pdf
Action plan for smart metering installation and data acquisition in pilot dwellings (Komotini) Action plan for smart metering installation_web.pdf
Selected suppliers & installers of smart metering devices (Komotini) D6.3.2_Selected suppliers & installers of smart metering devices rev1.pdf
Installed smart meters (Komotini) D6.4.1_Installed smart meters rev1.pdf
A summary of the experimentation plan on partners’ territory for smart metering in LIH ELIHMed_Experimentation_plan_D.6.2.2_summary.pdf
Smart metering experimentation in Cyprus CEA smart metering.pdf
View all images
Installation of the data logger in Mrs. Pischetola’s flat

Installation of the data logger in Mrs. Pischetola’s flat

 

The technique commission valuates the offers (Genoa)

The technique commission valuates the offers (Genoa)

ELIH-Med Poster made by Genoa City: what is ELIH-Med?

ELIH-Med Poster made by Genoa City: what is ELIH-Med?

ELIH-Med Poster made by Genoa City: Before project

ELIH-Med Poster made by Genoa City: Before project

ELIH-Med Poster made by Genoa City: Pilot project in Genoa

ELIH-Med Poster made by Genoa City: Pilot project in Genoa

ELIH-Med Poster made by Genoa City: Tenant participation

ELIH-Med Poster made by Genoa City: Tenant participation

ELIH-Med Poster made by Genoa City: Energy efficiency measures

ELIH-Med Poster made by Genoa City: Energy efficiency measures

ELIH-Med Poster made by Genoa City: energy diagnosis

ELIH-Med Poster made by Genoa City: energy diagnosis

ELIH-Med Poster made by Genoa City: after project

ELIH-Med Poster made by Genoa City: after project

Campanedda workshop

Campanedda workshop

Project dissemination

Project dissemination

National Meeting in Alghero

National Meeting in Alghero

National Meeting Smart City

National Meeting Smart City

Pilot house 1

Pilot house 1

Pilot house 2

Pilot house 2

Pilot house in Sassari

Pilot house in Sassari

Building location in Alghero

Building location in Alghero

Building location in Sassari

Building location in Sassari

Site visit

Site visit

Site visit in Sassari

Site visit in Sassari

Building diagnostic

Building diagnostic

Indoor temperature monitoring

Indoor temperature monitoring

Opaque wall U-value measurement

Opaque wall U-value measurement

A new attic insulated

A new attic insulated

New attic installation

New attic installation

High performance window replacement

High performance window replacement

Pilot building before refurbishment

Pilot building before refurbishment

Pilot dwelling in detail

Pilot dwelling in detail

Building location

Building location

Building before refurbishment (Fratt)

Building before refurbishment (Fratt)

Building after refurbishment (Fratt)

Building after refurbishment (Fratt)

Building after refurbishment (in detail)

Building after refurbishment (in detail)

Refurbishing work (Frattamaggiore)

Refurbishing work (Frattamaggiore)

Tenant interview

Tenant interview

Pilot dwelling

Pilot dwelling

Site visit

Site visit

PPCG meeting (Genoa)

PPCG meeting (Genoa)

Genoa poilo LIH tenants

Genoa poilo LIH tenants

PPCG meeting in Alghero

PPCG meeting in Alghero

PPCG meeting in Sassari

PPCG meeting in Sassari

Tenants Meeting Sassari

Tenants Meeting Sassari

Tenants Meeting Alghero

Tenants Meeting Alghero

National Meeting in Alghero

National Meeting in Alghero

Tenant interview

Tenant interview

Conference in ANEA

Conference in ANEA

Presentation of the call for public tender

Presentation of the call for public tender

Project design

Project design

Building entrance with new buffer spaces

Building entrance with new buffer spaces

Inner of new buffer spaces

Inner of new buffer spaces

High energy performance window replacement

High energy performance window replacement

Dissemination at national level

Dissemination at national level

Project presentation at local level

Project presentation at local level

Presentation of the call

Presentation of the call

Pilot building in Malaga

Pilot building in Malaga

Pilot site location

Pilot site location

Tenant visit

Tenant visit

Data collection during tenant visit

Data collection during tenant visit

Pilot Project Participative Group (PPCG) meeting

Pilot Project Participative Group (PPCG) meeting

Tenant visit

Tenant visit

External insulation of the roof

External insulation of the roof

External insulation of the floor

External insulation of the floor

Insulation of the façade

Insulation of the façade

Improving natural cross-ventilation

Improving natural cross-ventilation

EE measures adopted

EE measures adopted

Resume EE measures implemented in Malaga's ELIH-Med pilot dwelling

Pilot building Pio XII 49

Pilot building Pio XII 49

Pilot building Fontanares 65

Pilot building Fontanares 65

PPCG meeting in Valencia

PPCG meeting in Valencia

TMC meetings in Valencia

TMC meetings in Valencia

Pilot building before refurbishment

Pilot building before refurbishment

Pilot building after refurbishment (Genoa)

Pilot building after refurbishment (Genoa)

Roof insulation (Genoa)

Roof insulation (Genoa)

Building envelop installation (Genoa)

Building envelop installation (Genoa)

Tener selection_PIOXII pilot project (2)

Tener selection_PIOXII pilot project (2)

Sign contract

Sign contract

Tender selection for FONTANARES pilot project

Tender selection for FONTANARES pilot project

Tener selection_PIOXII pilot project

Tener selection_PIOXII pilot project

On-going pilot project in Valencia

On-going pilot project in Valencia

Roof insulation of  pilot dwelling in Valencia

Roof insulation of pilot dwelling in Valencia

Roof insulation of  pilot building P in Valencia

Roof insulation of pilot building P in Valencia

Energy day in Valencia

Energy day in Valencia

Custom audits and awareness campaign

Custom audits and awareness campaign

Pilot buildings in Mas Thibert (Arles)

Pilot buildings in Mas Thibert (Arles)

Facade of pilot building in Mas Thibert (Arles)

Facade of pilot building in Mas Thibert (Arles)

Pilot student residence building S2 in DUTH campus, Komotini (before refurbishment)

Pilot student residence building S2 in DUTH campus, Komotini (before refurbishment)

Pilot student residence building S1 in DUTH campus, Komotini (before refurbishment)

Pilot student residence building S1 in DUTH campus, Komotini (before refurbishment)

TMG meeting

TMG meeting

PPCG meeting in Komotini

PPCG meeting in Komotini

Pilot site with ELIH-Med sign

Pilot site with ELIH-Med sign

Building S3 façade insulation progress

Building S3 façade insulation progress

Building S1 façade insulation progress

Building S1 façade insulation progress

Building S3 façade insulation progress

Building S3 façade insulation progress

Building S3 after external insulation

Building S3 after external insulation

Solar collectors installed on building roofs

Solar collectors installed on building roofs

Signing of the sponsorship agreement

Signing of the sponsorship agreement

Roof PV panels provided by sponsor

Roof PV panels provided by sponsor

-	Elih-Med dissemination materials

- Elih-Med dissemination materials

Elih-Med press conference

Elih-Med press conference

-	Elih-Med dissemination through interview

- Elih-Med dissemination through interview

Elih-Med dissemination via Facebook

Elih-Med dissemination via Facebook

Awareness-raising events for users of pilot buildings

Awareness-raising events for users of pilot buildings

Elih-Med dissemination ITF Thrace

Elih-Med dissemination ITF Thrace

Internet dissemination

Internet dissemination

Press conference

Press conference

National capitalisation seminar

National capitalisation seminar

Thermal images of pilot dwellings

Thermal images of pilot dwellings

Pilot dwelling diagnosis results

Pilot dwelling diagnosis results

Site visit

Site visit

Visiting pilot building owners – information collecting

Visiting pilot building owners – information collecting

Pilot dwelling owner awareness raising

Pilot dwelling owner awareness raising

Pilot uilding 2 in Engomi (Cyprus)

Pilot uilding 2 in Engomi (Cyprus)

Elih-med capitalisation in Cyprus: SEAPEK conference

Elih-med capitalisation in Cyprus: SEAPEK conference

Elih-Med dissemination in SEAPEK conference

Elih-Med dissemination in SEAPEK conference

Project capitalisation: POEM conference

Project capitalisation: POEM conference

Project promotion materials

Project promotion materials

Roof waterproof and insulation

Roof waterproof and insulation

High efficiency fireplace (boiler included) installation

High efficiency fireplace (boiler included) installation

Wall (external & internal) insulation

Wall (external & internal) insulation

Thermal insulation of the roof

Thermal insulation of the roof

Façade insulation of pilot dwellings in Arles

Façade insulation of pilot dwellings in Arles

Floor insulation of pilot dwelling in Arles

Floor insulation of pilot dwelling in Arles

High performance window replacement

High performance window replacement

Pilot site with the construction panel

Pilot site with the construction panel

East-west façade before-after pilot experiment(design)

East-west façade before-after pilot experiment(design)

New east facade design

New east facade design

New south facade design

New south facade design

South façade before-after retrofitting

South façade before-after retrofitting

View all video
Awareness meeting with low income tenants (Genoa)
ELIH-Med pilot project in Genoa
Come migliorare l'efficienza energetica delle abitazioni? (ITA)
How to improve Energy efficiency of LIH? (ENG)
Where energy comes from?
Your Carbon Contribution
Genova 11 November 2011
National Awareness Campaign in Porto Conte_19-12-2013
National Awareness Campaign in Porto conte 3-10-2014
ELIH-Med Highlights (Italian subtitle)
ELIH-Med awareness campaign in Sardinia
ELIH-Med awareness campaign in Sardinia 2
Comente mezorare s’atoliu de s’energia in sas domos de familias cun pagos introitos?” (Sardo)
Sardinia pilot project (IT)
PPCG awareness campaign in Alghero (Sardinia)
2nd PPCG awareness campaign in Alghero (Sardinia)
PPCG awareness campaign in Campanedda (Sardinia)
Frattamaggiore pilot project (IT)
Malaga pilot project ‘“Los Limoneros building”
European Energy Day (Malaga)
How to improve Energy efficiency of LIH? (ES)
ELIH-Med 1st International Conference in Malaga
Awareness Campaign in Malaga (EN)
¿Cómo mejorar la eficiencia energética de las viviendas de bajas rentas? (in Spanish)
ELIH-Med Highlights (Spanish sub-title)
Dwelling house visits: awareness raising and data collection 1
Dwelling house visits: awareness raising and data collection 2
First call for tenders
Energy saving awareness raising Valencia (ES)
Raising public awareness of energy saving (Valencia, ES)
ELIH MED Valencia Energy Efficiency Pilot project
ELIH-Med Highlights (French subtitle)
Awareness raising in DUTH campus
??? ????? ?? ???????? ??? ?????????? ????????????? ?? ????????? ??????? ???????????; (GR)
Awareness raising in a Greek campus (GR)
Greek pilot project (GR)
ELIH-Med Highlights (Greek subtitle)
Cyprus pilot project (GR)

Pilot action

Diagnosis

Recommendation 21 -

Take into consideration the cooling demand according to climatic specificities

              

Recommendation 64 -

Develop consistent objectives and precise results to achieve, in terms of: energy efficiency, comfort, health and social improvement

                

Recommendation 65 -

Implement a diagnosis in a labelling approach

                

Recommendation 66 -

Take into account technical, structural and architectural criteria during the audits

                

Recommendation 68 -

Implement a more accurate survey about the owners behaviours regarding their ''hand made'' heating systems (individual fuel and electric devices, wood, etc.) and cooling systems

                

Recommendation 70 -

Involve inhabitants at diagnosis' stage

                

Recommendation 71 -

Regularly feed regional databases on the smart metering and surveys results

                

Recommendation 67 -

Take into consideration comfort improvement - including summer comfort - through a detailed questionnaire for the inhabitants and trough monitoring equipment

                

Recommendation 76 -

Take into consideration that the main part of energy consumption in the Mediterranean is about cooling demand

    

Recommendation 74 -

Take into consideration accessiblity issues in the audit because of the population ageing

      

Recommendation 73 -

Take the opportunity to work on energy efficiency issues, while a structural building audit is implemented, especially on building stock built before the 70's

      
Stakeholders involvement

Recommendation 77 -

Implement Territorial Management Groups at the beginning of the project:                     

  • Involving public authorities, key private stakeholders (as PV, banks, net metering and utility companies); inhabitants' representatives and social services;
  • Reinforcing their involvement in the process;                                              
  • Implementing a global approach in technical, social and administrative terms;
  • Participating to the monitoring process
                

Recommendation 78 -

Undertake thermographic surveys as part of the energy audits, in order to better implement energy performance diagnosis

          

Recommendation 79 -

Inform inhabitants on the basis of a global involvement strategy, through Participative Groups meetings, awareness tools, events, etc.

                

Recommendation 80 -

Involve local social services in order to reinforce inhabitants awareness and care

            

Recommendation 81 -

Promote innovative social approaches and active self construction works, in a 'do it yourself' concept

                

Recommendation 82 -

Encourage owners who asked for additional works by providing them technical and financial advices

                

Recommendation 84 -

Identify building malfunctions from the beginning of the identification process, by directly involving tenants

                

Recommendation 85 -

Develop an informative approach towards inhabitants based on in-site visits (monthly)

                

Recommendation 31 -

Drive low income private owners awareness campaigns:                

  • Sharing vocabulary, knowledge and experiences;
  • Explaining refurbishment process;
  • Training them to use monitoring devices/smart meters;
  • Facilitating access to diagnosis' services and to retrofiting public and private funds;
  • Implementing financial incentives to drive awareness campaigns
                

Recommendation 83 -

Take into consideration livability and quality of life (hygiene and health) prior to energy efficiency

                
Monitoring

Recommendation 87 -

Install metering devices into the dwellings with direct feedback and energy tips towards inhabitants

                

Recommendation 89 -

Go beyond uncertainty in the estimation of energy savings by monitoring the real consumption of different elements: appliances, lighting, heating, etc.

                

Recommendation 90 -

Measure comfort improvement through a long-term approach

                

Recommendation 91 -

Inform inhabitants on the basis of a global involvment strategy trough the Pilote Project Collaborative Group, events, meetings...

                

Recommendation 92 -

Contribute to define innovative financial engineering with public authorities

                

Recommendation 94 -

Avoid dependency regarding data access, and after-sales services with smart meters suppliers

                

Recommendation 86 -

Analyze before/after results with accurate data, by installing metering devices before refurbishment

                

Recommendation 88 -

Install smart metering devices with screens and interfaces for direct consumptions monitoring by the user completed by monthly report

                

Recommendation 93 -

Use simulation systems such as LIDER and CALENER 

  
Financing

Recommendation 95 -

Continue to finance extra works during the refurbishment process

              

Recommendation 96 -

Involve private local funders with regular feedback and data on the project

              

Recommendation 99 -

Implement small-scale interventions for increasing energy efficiency and the production of thermal energy from renewable sources, as Conto Termico

      

Recommendation 100 -

Reinforce "net metering" mechanisms - electric energy generated is delivered to local distribution facilities; as Scambio sul posto 

      
Tenders

Recommendation 101 -

Add bonus for applicants proposing additional measures for the same price (best value) and sponsorship

                

Recommendation 102 -

Add bonus for applicants using local materials

                

Recommendation 103 -

Professionalize tender engineering

              

Recommendation 104 -

Explain the technical innovative solutions and their specifications in the call for tenders

            

Recommendation 105 -

Have flexible public tender templates adapted to the project needs

              

Recommendation 106 -

Insert a contractors/tenants ''good relationship'' as a criteria of selection

          

Recommendation 107 -

Involve inhabitants in the renovation process in order to obtain additional points

                
Refurbishment

Recommendation 108 -

Anticipate building structural issues (i.e. asbestos)

              

Recommendation 110 -

Implement innovative and local insulation materials    

                

Recommendation 111 -

Maximize external insulation benefits with thermostatic heating control        

                

Recommendation 112 -

Work on materials properties regarding summer comfort technical solutions

                

Recommendation 113 -

Use district heating   

                

Recommendation 114 -

Match at municipal scale, urban renovation projects (equipements, infrastructures, public spaces renewal) and retrofitting process towards dwellings occupied by low-income households

                

Recommendation 115 -

Choose effective and simple solutions (due to limited budget, forbidden external interventions, presence of tenants in the dwelling)

                

Recommendation 117 -

Develop quicker payment methods for contractors (benefits on the works, avoiding delays)

      

Recommendation 119 -

Take advantage of cross ventilation

              

Recommendation 109 -

Have a detailed work plan/programme including technical measures, in order to narrow occupants disruption during refurbishment process

              

Recommendation 118 -

Promote the use of heat pumps for heating and cooling

  
Smart metering activity

Recommendation 87 -

Install metering devices into the dwellings with direct feedback and energy tips towards inhabitants

          

Recommendation 89 -

Go beyond uncertainty in the estimation of energy savings by monitoring the real consumption of different elements: appliances, lighting, heating, etc.

          

Recommendation 90 -

Measure comfort improvement through a long-term approach

          

Recommendation 92 -

Contribute to define innovative financial engineering with public authorities

    

Recommendation 94 -

Avoid dependency regarding data access, and after-sales services with smart meters suppliers

        

Recommendation 86 -

Analyze before/after results with accurate data, by installing metering devices before refurbishment

          

Recommendation 88 -

Install smart metering devices with screens and interfaces for direct consumptions monitoring by the user completed by monthly report

          

Recommendation 91 -

Inform inhabitants on the basis of a global involvment strategy trough the Pilote Project Collaborative Group, events, meetings...

      

Recommendation 93 -

Use simulation systems such as LIDER and CALENER 

  
Dissemination awareness and national project capitalization

Recommendation 120 -

Ensure long term savings through the awareness campaign and the pilot project participative group

                

Recommendation 121 -

Use certified monitoring equipments in order to convince energy efficiency investors of energy-efficiency measures benefits

                

Recommendation 122 -

Pursue energy retrofitting measures and extend them to the remaining building stock 

              
Policy paper and Ljubljana declaration